ENSURING STATUTORY INSPECTION REQUIREMENTS FOR INDUSTRIAL STEAM & HOT WATER BOILERS

Industrial steam boilers and high-pressure hot water boilers operating above 110°C are subject to mandatory annual inspections under the Pressure Systems Safety Regulations (PSSR) 2000. These statutory inspections are a critical part of ensuring the ongoing safety, reliability and compliance of pressure systems operating in industrial environments.

At McEwen Boilermakers, we specialise in the full preparation, servicing and testing of boilers ahead of these inspections. Our experienced team supports plant operators and duty holders with:

  • Comprehensive risk assessments
  • Mechanical preparation and inspection access
  • Non-destructive testing and functional checks
  • Seamless coordination with insurance inspectors

We work across all types and ages of industrial boilers, tailoring our approach to each system’s specific design, condition and operational demands. Whether you operate a steam or hot water boiler for manufacturing, processing, or energy applications, our inspection preparation services ensure you’re ready for your annual insurance visit, with minimal disruption to your operations.

solutions.

REDUCING RISK AND DOWNTIME THROUGH EARLY INTERVENTION

In addition to meeting regulatory obligations, annual inspection preparation presents an important opportunity to assess the condition of your boiler plant. Our engineers are trained to identify signs of wear, fatigue, corrosion or inefficiency that, if left unresolved, could lead to costly breakdowns or unplanned shutdowns.

By addressing emerging issues proactively, you benefit from:

process.

ANNUAL INSPECTION PREPARATION PROCESS

01
first step

INITIAL RISK ASSESSMENT

We begin with a detailed assessment of the boiler system to identify potential hazards and ensure compliance with PSSR 2000 requirements.

02
second step

DISASSEMBLY AND ACCESS PREPARATION

Key components, including steam valves, mountings, manlids, mudlids, and smokebox doors, are carefully removed to provide full access for inspection and servicing.

03
third step

VALVE SERVICING AND CERTIFICATION

Valves are either overhauled and re-certified at our workshop or serviced on-site, depending on system requirements and scheduling.

04
fourth step

CLEANING AND SURFACE PREPARATION

Both fireside and waterside surfaces are cleaned thoroughly, removing scale, corrosion, and deposits to allow accurate inspection and improve system efficiency.

05
fifth step

COMPONENT REPLACEMENT AND REASSEMBLY

We supply and fit new gaskets, seals, and ceramic joints as needed before reassembling all components to the original specification.

06
sixth step

INSPECTOR LIAISON AND STEAM TEST

We coordinate directly with your insurance inspector and conduct a live steam test to verify system performance, ensuring readiness for certification.

Boiler repair using an angle grinder

Do you have a project to discuss?
Get in Touch.

our work.

featured project

Boiler repair using an angle grinder

Do you have a project to discuss?
Let’s chat.

CASE STUDY

our services.

DOWNLOAD
THE BROCHURE